On Wednesday and Thursday, Attwood Equestrian Surfaces began removing the old footing in our indoor arena. Two Bobcat operators worked for about a day and a half and got to the bluestone base of the ring. There’s some leveling that needs to be done, so they will be dumping and leveling stonedust on Friday.

Our new Red Master Harrow arrived, too. On Friday, Attwood will be demonstrating how to drag the arena correctly to maintain the most level and best blend of the GGT and sand.

Here are some photos.

20110610-115806.jpg

20110610-115743.jpg

Indoor Arena Progress
Share

Post navigation


Leave a Reply